Resource and Activity Timeline

Published on November 25, 2026 QuoteX


Resource and Activity Timeline: Admin & End-User Guide

The Resource and Activity Timeline in QuoteX is a visual roadmap that shows who is doing what and when across your project. Phases, resource roles, activities, hours and price appear on a single timeline, so you can scope and review a services quote at a glance.

This guide has two parts:

  1. Part 1: System Administrator Guide. Install and configure the component.
  2. Part 2: Sales Engineer / Delivery Manager Guide. Use and understand the component.

Quick facts: Requires QuoteX v1.85 or later. Component: psce_ext:PSC_GanttWbs. Edits auto-save when you press Enter.

Part 1: System Administrator Guide

1. Prerequisites

Before you begin: make sure the following are in place in your Salesforce org.

  1. QuoteX v1.85 is installed.
  2. You have System Administrator privileges to install the package.

Package installation prerequisites

Figure 1: Package installation prerequisites.

Not installing for all users? Make sure the target users have the access below.

  1. The PSCTimelineController Apex class is granted to users of this feature.
  2. Users have Read/Write access to these objects: PSC Timeline Period, PSC Timeline Resource, PSC Timeline Resource Allocation, PSC Timeline PP (Plans) and PSC Timeline PP Allocation.

Apex class access

Figure 2: Apex class access.

Object permissions

Figure 3: Object permissions.

2. Add the Component in PSC Additional Schedule Tab Custom Metadata

  1. Go to Setup > Custom Metadata Types.
  2. Find PSC Additional Schedule Tab and click Manage Records.
  3. Click New.
  4. Enter the values below and click Save.
FieldValue
Table NameResource and Activity Timeline
Lightning Componentpsce_ext:PSC_GanttWbs
Order2

Custom metadata record configuration

Figure 4: Custom metadata record configuration.

3. Read-Only Mode

By default, users can add hours, create activities and delete plans. In the presentation mode of the timeline, the component becomes read-only.

Behavior when read-only:

  1. The Expand, Collapse and Refresh buttons are hidden.
  2. All input fields (Hours, Activities, Plan Names) render as plain text.
  3. The New Plan row and the Delete Plan trash can icons disappear.

Part 2: Sales Engineer / Delivery Manager Guide

The Resource and Activity Timeline maps your project's phases, resources and activities across the project timeline, giving you an immediate view of who is doing what and when.

The Resource and Activity Timeline

Figure 5: The Resource and Activity Timeline.

Understanding the Layout

The component has three main areas:

  1. Left column (sticky): the project hierarchy (Phases > Resource Roles > Activities/Plans).
  2. Middle grid (timeline): the periods (typically Months or Weeks) across the top.
  3. Right columns (sticky): the total Hours and Price for each row.

Layout areas of the timeline

Figure 6: Layout areas of the timeline.

The Visual Elements

ElementWhat it shows
Phase Bars (colored bars spanning the timeline)High-level project stages (for example, Design or Execution). Each phase gets a unique color.
Resource Bars (solid blocks with white text)Resource roles assigned to a phase (for example, Automation Engineer). The number inside is the hours allocated in that period.
Activity Cells (text in period columns)Specific deliverables or tasks (for example, Sprint 1 or Draft Releases).
Period HeadersPeriod name and exact date range (for example, Month 1 | Nov 15, '25 - Nov 30, '25).
Hours (right side)Total hours allocated to the row.
Price (right side)Total cost with the currency prefix (for example, USD 5,000.00).

Phase bars, resource bars, activities, hours and price

Figure 7: Phase bars, resource bars, activities, hours and price.

How to Use the Actions

1. Expand / Collapse Phases

  1. Click Expand (top right) to see all roles and activities under every phase.
  2. Click Collapse to hide the details and show only the high-level phases.
  3. Click the chevron icon (>) next to a phase name to expand or collapse just that phase.

Expand and Collapse controls

Figure 8: Expand and Collapse controls.

2. Adjust Resource Hours

  1. Locate a resource row (for example, Developer).
  2. Click a number inside the colored block (for example, 90).
  3. Type a new number and press Enter.
  4. The system recalculates total hours and updates the price automatically.

3. Manage Activities (Plans)

Activities in this component are stored as Plans.

  1. Edit an activity: click the text in a cell (for example, Sprint 1), type a new name and press Enter.
  2. Delete an activity: click the text, delete all characters and press Enter.
  3. Create an activity: scroll to the bottom of a phase, find the row labelled Type new Plan name + Enter..., click any cell in that row, type the activity name and press Enter.

Note: You do not need to name the plan first. The system automatically creates a blank plan behind the scenes to hold the activity.

4. Name, Rename and Delete Plans

Adding a new activity creates a Plan. Manage plans from the left column:

  1. Rename a plan: click the italic text (for example, PP-000), type a new name and press Enter.
  2. Delete a plan: click the red trash can icon next to the plan name.

Warning: Deleting a plan removes the plan and all activities attached to it. This cannot be undone from the timeline.

Plan rename and delete controls

Figure 9: Plan rename and delete controls.

Quick Reference

I want to...Do this
See every role and activityClick Expand (top right)
Change hours for a periodClick the number in the resource bar, type a value, press Enter
Add an activityUse the Type new Plan name + Enter... row at the bottom of the phase
Rename a planClick the italic plan name, type, press Enter
Delete a plan and its activitiesClick the red trash can icon
Make the timeline read-onlySwitch to the timeline's presentation mode

Frequently Asked Questions

Q: Why are some columns empty with a striped background?
A: The striped background means the phase does not span that time period.

Q: I edited an activity, but the cell turned blank afterward. Did it save?
A: Yes. The component auto-saves on Enter. A green success toast at the top right of your screen confirms the save.

Q: What happens if I have more than 12 phases?
A: The component uses 12 distinct colors. With more than 12 phases, colors start to repeat, but the data remains accurate.

Q: How is the Price calculated?
A: Price is the Hours entered in the grid multiplied by the Rate on the specific Timeline Resource record. The total is shown with your Estimate's currency ISO code (for example, USD).

Price displayed with currency code

Figure 10: Price displayed with currency code.



Knowledge Article Number: KA-00511